1st Assistant - Fife, United Kingdom - JAB Recruitment

    Default job background
    Description

    Job Description

    Our client is currently looking for an experienced 1st Assistant that can join a 4-5 month offshore campaign on their North sea offshore wind farm.

    Mission:

    Coordinate work and manpower on board for the assigned shift in compliance with Project specification, in order to ensure

    efficient performance and respecting HSE and Quality procedures and practices

    Tasks:

    Assist the Offshore Construction Manager with regard to interdisciplinary coordination of all works on board

    Supervise the team of foremen and supervisors, with regard to the various disciplines/categories of construction and assembly work, in order to comply with the quality and safety standard

    Coordinate the construction activities during the shift and optimise all production phases

    Ensure that the Offshore Construction Manager is kept fully informed of potential problems and construction status

    Liaise with Chief Mate, 2nd Engineer and Vessel Equipment Engineer in order to ensure preventive maintenance and construction activities

    Liaise with subcontractors' supervisors to optimize production

    Solve matters related to coordination, priority and interface between the different disciplines in order to meet the scopes of the project

    Ensure that the Permit-to-Work system for construction crew is adhered to and ensures that the daily Tool Box Talks and JSA, if required, are carried out according to the procedures

    Motivate all construction crew/subcontractors with regards to health, safety and environment awareness

    Ensure the compliance with the standards dictated by QHSE policies and safety procedures, in order to perform the activities in a safe manner

    Report incidents and near-miss events

    Manage the Crane operations, including coordination with the Chief Mate for main crane movements on board, ROV launching and underwater operations

    Assist marine operations if required

    Provide a construction report at the end of each shift

    Assist the Vessel Field Engineer in the follow up of project equipment and consumable, operation and monitoring of the stinger and JLT

    Ensure the rigging gear used is within date and properly marked

    Report to the Offshore Construction Manager